One roof, start to finish
Rather than a wall of stock photos, here is an actual Iowa tear-off and replacement in the order it happened. Tap any photo to see it full size.
What you are looking at
The parts of the job you never see from the ground
Almost everything that decides how long a roof lasts is buried under the shingles. Here is what we are doing in those photos, and why.
Tarps go down first
Shrubs, beds, AC units and walkways get covered before tear-off starts, and the dumpster sits on boards so it does not sink ruts into the lawn.
The deck gets inspected
With the old roof off we can finally see the sheathing. Soft, cracked or delaminated boards get replaced — and we show them to you before they go in the dumpster.
Drip edge, then underlayment
New metal drip edge along the eaves, ice-and-water shield where Iowa needs it, then synthetic underlayment over the whole field. This is the layer that actually keeps water out.
Ridge vent at the peak
The ridge gets cut open and a continuous vent installed so the attic can exhaust. Paired with clear soffit intake, this is what keeps the roof from cooking itself.
New boots and flashing
Pipe boots, step flashing and valley metal get replaced with the roof. Reusing tired flashing on a brand new roof is how a two-year-old roof starts leaking.
Magnet, then a walkthrough
Rolling magnet across the lawn and driveway, gutters cleared of debris, then we walk the finished job with you before anybody leaves.